G. Position the columns
Position the columns on the installation layout of base plate. Install the anchor bolts.
Check the columns plumbness with level bar and adjust with shims if the columns
are not vertical. Do not tighten the anchor bolts
(See Fig.20)
.
Note:
Minimum embedment of Anchors is 4
”
.
Drilling
Cleaning
Bolting
4
”
Width between
columns:112 1/8
”
Overall width
:
139
½”
Adjusting with
the shims
56
10
3
¾”
Fig.20