SmartROC D65 Tier 4 Final
2 General
22
2.
Remove the jumper lead between the negative terminal on battery G1A and the posit-
ive terminal on battery G1B.
3.
Connect the positive battery charger cable to the positive terminal on G1A.
4.
Connect the batter charger's negative lead to the negative terminal on G1A.
5.
Start the battery charger.
6.
Once battery G1A is fully charged:
Turn off the battery charger.
7.
Detach the battery charger's negative lead from the negative terminal on G1A.
8.
Detach the battery charger's positive lead from the positive terminal on G1A.
9.
Detach the cable between chassis ground and the negative cable on the battery G1B.
10.
Repeat steps 3 - 8 on G1B.
After charging
1.
Turn off the battery charger.
2.
Reconnect the jumper lead between the negative terminal on battery G1A and the
positive terminal on battery G1B.
3.
Connect the cable between chassis ground and the negative terminal on G1B.
4.
Activate battery isolation switch S300.
2.2.3 Starting with an auxiliary battery
!
NOTE:
Owing to the surge of current, the batteries could explode if a fully-charged bat-
tery is connected to a completely flat one.
NOTE:
The connections to the drill rig's batteries must under no circumstances be
broken during operation as this could lead to faults arising in the alternator.
Condition
p
For this reason, proceed as follows:
1.
Check that the auxiliary starting batteries (1) have the same voltage as the batteries
on the chassis.
Starting assistance
1
Auxiliary batteries
2
Chassis batteries
Summary of Contents for SMARTROC D65 TIER 4 FINAL
Page 2: ......
Page 4: ......
Page 10: ...SmartROC D65 Tier 4 Final Table of Contents x...
Page 32: ...SmartROC D65 Tier 4 Final 2 General 32...
Page 38: ...SmartROC D65 Tier 4 Final 3 Transport instructions 38...
Page 50: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 50 Rig Layout Feeder Layout...
Page 69: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 69 Rig Layout Feeder Layout...
Page 86: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 86 Logging Signal Log Signal Log...
Page 109: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 109 Drilling DCT DCT n Parameters n Actuations...
Page 120: ...SmartROC D65 Tier 4 Final 5 RCS drilling system 120 Rig parameters Parameters n Tramming...
Page 140: ...SmartROC D65 Tier 4 Final 6 Hydraulic systems 140...
Page 157: ...SmartROC D65 Tier 4 Final 9 Dust collector DCT 157 Dust collector...
Page 158: ...SmartROC D65 Tier 4 Final 9 Dust collector DCT 158...
Page 160: ...SmartROC D65 Tier 4 Final 10 Radiator 160 Radiator and expansion tank...
Page 170: ...SmartROC D65 Tier 4 Final 11 Diesel engine 170...
Page 182: ...SmartROC D65 Tier 4 Final 12 Compressor and air system 182...
Page 192: ...SmartROC D65 Tier 4 Final 13 Oil and fuel 192...
Page 219: ...14 Options 219...
Page 220: ...www atlascopco com 2015 12 17 No 713991051 3...