PAGE
124
ALMAC s.r.l.
6.2.8
Checking the operation of the maximum pressure valves
With the frequency indicated in the general chart, check the operation of the
maximum pressure valves of the distributor.
To test them, connect two pressure gauges with a full scale of 250 bar to the
pressure outlets supplied (4 and 5).
Checking the general maximum pressure valves of the system (1 and 3)
The pressure gauges relating to these valves are those connected to the outlets
4 and 5.
a)
Start the internal combustion engine.
b)
Perform the levelling movements until the limit switch has been reached
and keep them in this position for a few seconds. This activates the
maximum pressure valve of the circuit.
c)
Read the pressure on the gauge, which should be 200 bar ± 5 bar
Summary of Contents for 850-BL EVO
Page 7: ...PAGE 7 ALMAC s r l MAXIMUM WORKING HEIGHT TRAVELLING NOT PERMITTED H1 H2 G3 H3 H4 G4 G1 L1 G2 ...
Page 10: ...PAGE 10 ALMAC s r l ...
Page 23: ...PAGE 23 ALMAC s r l ...
Page 49: ...PAGE 49 ALMAC s r l 35 Combustion engine 36 Fuel tank 37 Bi levelling chassis 37 38 ...
Page 78: ...PAGE 78 ALMAC s r l ...
Page 80: ...PAGE 80 ALMAC s r l ...
Page 144: ...PAGE 144 ALMAC s r l ...
Page 145: ...PAGE 145 ALMAC s r l ...
Page 146: ...PAGE 146 ALMAC s r l ...
Page 147: ...PAGE 147 ALMAC s r l ...
Page 148: ...PAGE 148 ALMAC s r l ...
Page 149: ...PAGE 149 ALMAC s r l ...
Page 150: ...PAGE 150 ALMAC s r l ...
Page 151: ...PAGE 151 ALMAC s r l ...
Page 152: ...PAGE 152 ALMAC s r l ...
Page 159: ...PAGE 159 ALMAC s r l ...
Page 162: ...PAGE 162 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Page 164: ...PAGE 164 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature ...
Page 178: ...PAGE 178 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...