PAGE
40
ALMAC s.r.l.
2.13
Personal protective equipment (PPE)
To operate the machine in complete safety, it is necessary to use appropriate
personal protective equipment, which must be worn before climbing onto the
work platform and used as indicated.
-
Retaining system
-
Safety helmet
-
Safety shoes
-
Protection Gloves
Retaining system
Before climbing onto the work platform, it is mandatory to wear suitable fall
protection systems, which must be such as to completely prevent falling from a
height.
The safety device consists of a full body harness (1) complying with UNI EN 361,
with front or rear coupling equipped with retaining or adjustable lanyard (2) for
EN 358 which allows to prevent the fall, hooked to the pre-arranged hooking
point in the basket, by means of connectors (3) EN 362 having a suitable shape
and dimensions.
Once climbed onto the work platform, clip on the connector to one of the
coupling points placed on the floor in the front area of the platform and
indicated by the related symbol. Then adjust the lanyard as short as possible, so
as to retain the operator inside the work platform.
Summary of Contents for 850-BL EVO
Page 7: ...PAGE 7 ALMAC s r l MAXIMUM WORKING HEIGHT TRAVELLING NOT PERMITTED H1 H2 G3 H3 H4 G4 G1 L1 G2 ...
Page 10: ...PAGE 10 ALMAC s r l ...
Page 23: ...PAGE 23 ALMAC s r l ...
Page 49: ...PAGE 49 ALMAC s r l 35 Combustion engine 36 Fuel tank 37 Bi levelling chassis 37 38 ...
Page 78: ...PAGE 78 ALMAC s r l ...
Page 80: ...PAGE 80 ALMAC s r l ...
Page 144: ...PAGE 144 ALMAC s r l ...
Page 145: ...PAGE 145 ALMAC s r l ...
Page 146: ...PAGE 146 ALMAC s r l ...
Page 147: ...PAGE 147 ALMAC s r l ...
Page 148: ...PAGE 148 ALMAC s r l ...
Page 149: ...PAGE 149 ALMAC s r l ...
Page 150: ...PAGE 150 ALMAC s r l ...
Page 151: ...PAGE 151 ALMAC s r l ...
Page 152: ...PAGE 152 ALMAC s r l ...
Page 159: ...PAGE 159 ALMAC s r l ...
Page 162: ...PAGE 162 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Page 164: ...PAGE 164 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature ...
Page 178: ...PAGE 178 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...