® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 19 -
2.5
Fixing
General and local regulations must be observed. Therefore, these steps should only be
carried out by a trained professional.
The machine must be set up and fixed on sufficiently firm ground, if necessary, according to the minimum
requirements of the information given in the foundation plan.
The machine must be fastened at the points provided with suitable or specified fastening material.
In addition to the ground conditions, the guidelines and instructions of the accident prevention regulations
as well as the workplace regulations must be observed when selecting an installation site.
When assembling on floor coverings, check their load-bearing capacity. A construction expert should be
consulted for inspection when mounting on floor coverings.
2.6
Electrical Connection
General and local regulations must be observed. Therefore, these steps may only be
carried out by a trained professional.
Pay attention to the necessary supply line (see technical data).
The connection should be made with a 230V Schuko plug or 5-phase 16 A CEE plug (partially included).
Voltage deviations should be 0.9 - 1.1 times the nominal voltage range and the frequency deviation should
be 0.99 - 1.01 times the frequency range.
Necessary protective measures must be taken to guarantee this.
At the end of the work, the direction that the motor rotates must be checked.
2.7
Pneumatic Connection
For all pneumatic systems, a compressed air maintenance unit (partially included) must
be installed between the supply line and the system.
The air pressure of the supply line must at least correspond to the technical data.
The compressed air maintenance unit must be set correctly and checked.
The compressed air maintenance unit must be serviced at regular intervals.
The maximum or minimum pressure ensures perfect functioning without any damage.
Summary of Contents for M126
Page 3: ...BEDIENUNGSANLEITUNG ATH M126 ...
Page 47: ...OPERATING INSTRUCTIONS ATH M126 ...
Page 91: ...MANUEL D UTILISATION ATH M126 ...
Page 135: ...NÁVOD K OBSLUZE ATH M126 ...
Page 179: ...MANUAL DE INSTRUCCIONES ATH M126 ...
Page 223: ...BEDIENINGSHANDLEIDING ATH M126 ...
Page 267: ...INSTRUKCJA OBŁSUGI ATH M126 ...
Page 311: ...NÁVOD NA OBSLUHU ATH M126 ...