2.10
Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
Lift configuration
- Check that all buttons are working. When the Lower button is pressed, check
that all catches are unlocked.
Synchronisation setting:
Catch setting (for axle measurement):
Raise the lift to a height of
approx. 600 mm.
“Park” the lift in the first catch.
Check that the guide rails are level (using a spirit level)
for both setting options specified above.
Summary of Contents for Four Lift 65
Page 3: ...BEDIENUNGSANLEITUNG ATH Four Lift 65 ...
Page 55: ...OPERATING INSTRUCTIONS ATH Four Lift 65 ...
Page 107: ...MANUEL D UTILISATION ATH Four Lift 65 ...
Page 159: ...NÁVOD K OBSLUZE ATH Four Lift 65 ...
Page 211: ...MANUAL DE INSTRUCCIONES ATH Four Lift 65 ...
Page 263: ...BEDIENINGSHANDLEIDING ATH Four Lift 65 ...
Page 315: ...INSTRUKCJA OBŁSUGI ATH Four Lift 65 ...
Page 367: ...NÁVOD NA OBSLUHU ATH Four Lift 65 ...