Assembly
Setting up and aligning the ramps with crossbeams
Position the crossbeams on suitable safety blocks or square timbers. Then position and fix the
guide rails to the crossbeams.
WARNING: The main rail P1 (with cylinder) must be on the left in the
direction of travel.
The guide rails for the jacking beam must be facing inwards.