IV. Parameter configuration
After installed and connected, the charging equipment must first be configured
according to the actual needs of the user. The parametersare configured through
the LCD touch screen. Save the change and exit then the charging equipment can
be used normally.
After the system enters standby, click the button marked by the red rectangle in
the above figure to enter the system management page, as shown below.
System management page
3) The minimum height of foundation is 150mm above ground, the vertical
inclination degree should be less than 5%.
3.2 Cable connection
Connect the buried three phase four wire AC cables to the input terminal of the
charger with correct color order and phase sequence. The earth cable shall be
connected to the grounding bar of the charger. Wiring illustration is shown in elow.
Please notice: For safety, the charger must be grounded securely.
Connect the grounding bar of the charger to the equipotential bonding bar of the
2
installation site. The grounding cable should be no less than 25mm . Grounding
resistance shall be less than 4Ω.
Notice
:
1. Only professional personnel can do the wiring, connect the AC input wires in
correct phase order according to the markings on the terminal block.
2. The PE terminal shall be connected to the Earth firmly and reliably.
3. No live work! Turn off the upstream breaker in the distribution panel and the
breaker inside the charging equipment before repairing or maintaining.
4. Please do no disassemble the unit unless authorized.
L1
L2
L3
N
PE
Terminal
Wire
2
≥
35mm
≥
AWG2
2
≥
35mm
≥
AWG2
2
≥
35mm
≥
AWG2
2
≥
35mm
≥
AWG2
2
≥
25mm
≥
AWG3