Chapter 3: Installation Options
3-6
1
2
9.
Align the server system and gently
insert it into the rack rails.
Intermediate rail
Inner rail
11. Gently push the server system until it is completely installed into the rack rail.
(optional) For 1200 mm rack rails, if the inner rail clicks to a stop while you are installing
the server system into the rack rails, slide the blue release tab outwards and gently
push the server system until it is completely installed into the rack rail.
10. (optional) Use the M5X20L screws to
secure the rack rails to the rack post.
Front end of rack rail
Front rack post
Blue release tab
White release tab
The blue release tab is available on 1200 mm rack rails. This blue release tab is used to
further extend or retract the inner rail.
Summary of Contents for 90SF0071-M00360
Page 1: ...2U Rackmount Server ESC4000 G4 Series User Guide ...
Page 10: ...x ...
Page 84: ...Chapter 2 Hardware Setup 2 56 ...
Page 96: ...4 2 Chapter 4 Motherboard Information 4 1 Z11PG D16 Motherboard layout ...
Page 176: ...6 18 Chapter 6 RAID Configuration ...
Page 194: ...7 18 Chapter 7 Driver Installation ...
Page 202: ...A 8 Appendix ...