Page: 5
Pre-i
nstallation information
Plumbing:
Fit cold (
on left)
and
hot (
on right
) outlets
with their centres at 200mm above the floor, pointing
upwards,
offset to the left of the centre
line of the unit by 1
40
mm
terminating with 3/4” BSP
washing machine isolation valves
. These feeds will be enclosed by 50x75mm trunking upon
installation.
Fit a
32mm
/1¼”
waste pipe
with its centre
at
20
0mm above the floor
, on the centreline
of the unit
.
Electrics:
The ABW
-CP
is supplied
by
mains electric (30v) and transformed to 4v within the unit.
A 30mA
RCD protected fused spur is required, with
a
flush mounted flex outlet cover, on the wall behind the
unit at a height of 1100mm from the floor on the centreline
of the unit.
Fixing:
The basin assembly should be fixed to a load bearing wall (i.e. strong enough to carry a 100kg load
on wall fixing) which is flat and free from obstruction from 200mm – 2200mm above the floor. If
the basin needs to be fixed to a stud wall, the wall will need special reinforcement, either
150mm
/6"
noggins as shown above or 25mm
/
1" marine or exterior plywood may be used to cover
the entire fixing area, secured to the stud work every 200mm.
Fig
4
Version
4
:
2
5
-0
9
-01
9