Caution:

 The unit is fitted with a

n obstacle sensing switch

, if the unit encounters an obstruction 

under the front portion of the basin whilst travelling downwards it will automatically stop. Pressing 

the ‘Up’ 

button will allow the obstruction to be removed. Care should be taken to ensure that 

whilst the basin assembly is moving downwards there are no obstructions left directly 

beneath the basin or rise & fall unit as the 

obstacle sensing switch

 is designed to 

stop the unit only when the front of the basin is lifted. 

If both the ‘Up’ and 

Down’ buttons are pressed at the same time the unit will not 

move.

Cleaning

The basin and vanity top may be cleaned using most mild cleaning agents. Chemical agents must not 

be used, i.e. drain cleaners, acetone, oven cleaners or acids. The rise and fall unit and handset 

should be cleaned using a warm soapy solution and rinsed with a damp cloth. Attention should 

always be paid to instruction labels on the outside of cleaning agent containers.

 Test the cleaner on 

a discrete area (e.g. underneath the unit).

Troubleshooting

In the unlikely event that problems occur with t

he unit, carry out the following easy checks to

 

determine whether or not an engineer is required

:

 

Fault: 

 

The rise and fall unit does not travel up or down

.

Cause: 

 

The mains power supply 

may have

 been disconnected

.

 

Remedy: 

 

Examine the mains fuses/circuit breakers and reset as necessary and ensure that mains voltage is 

fully reconnected

.  

If the 

unit still 

fails to 

oper

ate an electrician needs to ensure that mains 

electrical supply is available at the fused spur (a fuse may have blown elsewhere in the circuit)

.

Fault:

Cause:  

The rise and fall unit travels upwards but not downwards

There 

may be 

an obstruction underneath the basin

.

Remedy:

 

Depress the ‘Up’ button on the handset to gain clearance from the obstruction and then remove the 

obstruction. The rise & fall unit 

should

 then resume normal function

.

If the problem persists after carrying out these remedies, please

 

contact Astor-Bannerman 

(contact 

details can be found

 on the back page

 of this user guide)

.

Our policy is one of continuous improvement and we therefore reserve the right to make 

technical alterations without notice. 

 

The content of this publication may not be copied 

either whole or in part without the consent of Astor–Bannerman. 

 Version 

4

 : 

2

5

-0

9

-01

9

Summary of Contents for ABW-CP

Page 1: ...Warranty No Version 4 25 09 019 ABW CP Height Adjustable Basin INSTALLATION and USER GUIDE ...

Page 2: ...ver further clockwise will make the water hotter then rotating the lever anti clockwise will make the water colder To turn the water off rotate the lever anticlockwise as far as it will go Our policy is one of continuous improvement and we therefore reserve the right to make technical alterations without notice The content of this publication may not be copied either whole or in part without the c...

Page 3: ...ng In the unlikely event that problems occur with the unit carry out the following easy checks to determine whether or not an engineer is required Fault The rise and fall unit does not travel up or down Cause The mains power supply may have been disconnected Remedy Examine the mains fuses circuit breakers and reset as necessary and ensure that mains voltage is fully reconnected If the unit still f...

Page 4: ...eight 50Kg A weighted sound emission 70dB A Our policy is one of continuous improvement and we therefore reserve the right to make technical alterations without notice The content of this publication may not be copied either whole or in part without the consent of Astor Bannerman All dimensions in mm Fig 3 Version 4 25 09 019 ...

Page 5: ... 30v and transformed to 4v within the unit A 30mA RCD protected fused spur is required with a flush mounted flex outlet cover on the wall behind the unit at a height of 1100mm from the floor on the centreline of the unit Fixing The basin assembly should be fixed to a load bearing wall i e strong enough to carry a 100kg load on wall fixing which is flat and free from obstruction from 200mm 2200mm above ...

Page 6: ... drill two full depth pilot holes at the marked positions and then open up in order to accept the appropriate fixings Fix the attachment rail onto the wall with the open lip uppermost using two suitable fixings Ensure that the rail is horizontal using a level adjust to suit and check that it is secure Installation Please Note Due to the complexity of different building methods Astor Bannerman do n...

Page 7: ...en mark the wall through the three attachment points one on the upper and two on the lower horizontal beams see Fig 8 below Remove the unit from the wall and at each of the three marked positions drill a 6mm full depth pilot hole Open these three holes to accept appropriate fixings Fit the fixings into the wall With assistance place the rise and fall unit back onto the wall mounted rail ensuring i...

Page 8: ...Fig 9 above and page 10 of tap manufacturer s instructions steps 1 3 but DO NOT CONNECT THE HOSES YET Fit the basin assembly to the high low frame Remove the protective film from double sided sticky tape fitted to the pivoting arms and place the basin onto the support arms as far back as possible ensuring the basin is under the white plastic upper cover Plumb in the tap Fit the plumbing to the tap...

Page 9: ...tap connector already fitted Fit the tap body to the base see page 10 of tap manufacturer s instructions step 4 only DO NOT TURN ON THE WATER SUPPLIES YET Fit the mains water supply Fit the white plastic lower and upper covers and waste assembly Remove retain the mushroom heads from the four plastic rivets found in the packing kit Fit the lower cover and align the holes in the cover with the holes...

Page 10: ...cument to the client Test and set the tap Turn on both water supplies and move the tap handle to both cold and hot positions letting the water flow for a few minutes to finish flushing through the system With the handle in the hottest position check the temperature of the water is 41ºC and correct if necessary see page 19 of tap manufacturer s instructions Fit the cap back onto the trunking Test t...

Page 11: ...299 VAT No 630 6090 68 Manufacturers Name Manufacturers Address Equipment Type ABW CP Height adjustable basin I hereby declare that the above product conforms to the following specification EDICAL IRECTIVE LECTRICAL 3AFETY 1 SSISTIVE PRODUCTS FOR PERSONS WITH DISABILITY Signed Technical Director Astor Bannerman Medical Ltd Unit 11F Coln Park Andoversford Cheltenham Gloucestershire GL54 4HJ For and...

Page 12: ...hout notice The content of this publication may not be copied either whole or in part without the consent of Astor Bannerman Medical Limited Original Document Page 12 Astor Bannerman Ltd Unit 11f Coln Park Industrial Estate Andoversford Cheltenham GL54 4HJ Email sales astorbannerman co uk Tel 44 0 1242 820820 Fax 44 0 1242 821110 Version 4 25 09 019 ...

Reviews: