INSTALLATION
20
INSTALLATION
Introduction
This section contains information for the unpacking, inspection, preparation for use and
storage of your Associated Research, Inc., product.
Unpacking and Inspection
Your instrument was shipped in a custom foam insulated container that complies with
ASTM D4169-92a Assurance Level II Distribution Cycle 13 Performance Test Sequence.
If the shipping carton is damaged, inspect the contents for visible damage such as dents,
scratches or broken meters. If the instrument is damaged, notify the carrier and the
Associated Research customer support department immediately. Please save the shipping
carton and packing material for the carriers inspection. Our customer support department
will assist you in the repair or replacement of your instrument. Please do not return your
product without first notifying us and receiving an RMA (return materials authorization)
number.
Preparation for Use
Power Requirements and Line Voltage Selection
This instrument requires a power source of 115 volts AC ± 10%, 50/60
Hz
±
5% single phase or 230 volts AC ± 10%, 50/60 Hz
±
5% single
phase. Please check the rear panel to be sure the proper switch setting
is selected for your line voltage requirements before turning your
instrument on. In addition, please be sure the correct fuse is selected and installed while
the instrument is in the off position.
Do not switch the line voltage selector switch located on the rear panel while the
instrument is on or operating. This may cause internal damage and represents a safety risk
to the operator.
NOTE
For operation at 115 Volts AC and 230 Volts AC use a 15A fast acting fuse.
CAUTION
Summary of Contents for Hypot II 4500D
Page 5: ...SECTION 1 OPERATORS MANUAL ...
Page 43: ...SECTION 2 SERVICE MANUAL ...