
10
P/N LT-503200 Rev B
Determine Lever Handing
Hinges on Right
Hinges on Left
RH
RHR
Lever
LH
LHR
Lever
Right handed
lever position
Left handed
lever position
Before proceeding with the next step,
ensure correct lever handing for proper installation.
Correct "curved" position
Correct "curved" position
Incorrect
Incorrect
Determine Lever Position
Both exterior and interior lever handles should
always point toward the door hinges.
Important Note:
Follow the detailed instructions for cylinder installation starting with step 13 on page
11 of the installation and programming manual. Next, perform the operation tests defined in step 20
on page 13 of the installation and programming manual.
Failure to install and test the cylinder for proper function may result in improper lock operation.