background image

4 - T9 PRO

ASL MACHINES USA 2018 ©

Do not allow machine to come into contact with 

loose tiles or other obstructions on the  floor. 

the abrasives will be turning at approximately 

650 Rpm. If objects are hit, they could become 

dangerous projectiles!

• Extend the handle and tilt machine back until 

handle rests on  oor.

• Install diamonds and remove transport wheel. 

• Bring machine back to operating position.

• Fill water tank if wet grinding.

I. Preparing to start the engine

1. First - check fuel cylinder for over ll and 

install cylinder onto machine.

2. Place machine on level surface and check for 

correct oil level.

J. transporting the machine

1. The tank should be securely fastened. 

2. The tank valve must be closed.

STARTING THE ENGINE

1. Open propane (LPG) tank valve (counter 

clockwise).

2. Turn the key to start position and move 

throttle towards fast position.

3. If engine does not start, release the key, then 

try again.

4. Equipment is supplied with a centrifugal 

clutch. When engine RPM is lower than 800 

RPM clutch will disengage; drivers will stop.

5. Increase throttle to about 75% while walking 

very slowly.

A.  NEVER TILT BACK MACHINE WHILE 

ENGINE IS RUNING

STOPPING THE ENGINE

Turn the propane tank valve clockwise to a 

closed position and turn the key OFF.

NOTE: The exhaust system will be very hot and 

takes several minutes to cool, so keep yourself 

and all materials clear.

MAINTENANCE

A. Cleaning the equipment

1. Place machine in “tilt back” position.

2. Rinse the drive unit and drivers.

3. Rinse around splash skirt and body.

4. Return machine to operating position, then

start engine and run machine briefly to expel

any excess water.

B. Storing the machine and tank

1. The engine should be stopped properly and 

the tank valve closed.
2. Remove the LPG tank from the machine and 

store the tank in a well ventilated approved 

area. 
3. Store your machine in a safe area: away 

from enclosed high heat, away from sparks or  

ames, and away from traf c lanes of heavy

equipment.

D. Machine & Engine Maintenance

1. Refer to engine manufacturer’s Owners 

Manual and comply completely with the 

instructions. Change the oil and filter according 

to the engine Owners Manual.

2. Keep a good service log on each machine 

with the date, hour meter reading, type(s) of 

service performed and the name of the person 

who performed them.

3. Clean the entire unit after each use. When 

cleaning the unit, check for possible loose nuts 

and bolts.

4. The foam engine dust filter should be 

removed and cleaned periodically by shaking 

out the accumulated dust and rinsing with water 

Summary of Contents for T9 PRO

Page 1: ...Propane Concrete Grinder and Polisher OWNER S MANUAL Made in the USA 9328 Wheatlands Rd Suite A Santee CA 92071 866 275 0446 info ASLMachinesUSA com ASLMachinesUSA com facebook com aslmachinesusa Version 1 051618 ...

Page 2: ...arting the Engine 5 Stopping the Engine Maintenance 6 Chapter II 7 Motor Operational Setup 7 LPG Motor Maintenance 12 Troubleshooting Propane Fuel System 16 Wire Schematic 17 Chapter III 18 Equipment Operation Method 18 Belt Changing Adjusting 20 Equipment Storage 22 Machine Warranty Information 23 T9 PRO BROCHURE 24 Notes 25 ...

Page 3: ...ancer reproductive toxicity or other harmful effects Control dust mist and fumes at the source where possible in this regard use good work practices and follow the recommendations of the manufacturers or suppliers OSHA NIOSH and occupational and trade associations Water should be used for dust suppression when wet cutting is feasible When the hazards from inhalation of dust mists and fumes cannot ...

Page 4: ...nt can be readily moved from site to site A Tilting the Machine This is a heavy piece of equipment Caution should be used in tilting the machine This can be accomplished safely and easily as follows 1 One man method a Standing behind the machine place one foot on the brace at the base of the propane tank b Place one hand on the handle and the other on the T frame handle support c While pulling and...

Page 5: ...t of a full tank should not exceed 48 pounds If while operating the machine you notice frost forming on the LPG lines or the regulator your tank has been over filled If you continue to operate the machine in this condition damage will occur The excess propane in the tank must be removed before normal operations resume The bleeding of a propane tank should be done in a safe location outside the bui...

Page 6: ...E Turn the propane tank valve clockwise to a closed position and turn the key OFF NOTE The exhaust system will be very hot and takes several minutes to cool so keep yourself and all materials clear MAINTENANCE A Cleaning the equipment 1 Place machine in tilt back position 2 Rinse the drive unit and drivers 3 Rinse around splash skirt and body 4 Return machine to operating position then start engin...

Page 7: ...rritating gas symptoms of CO exposure include headache drowsiness dizziness and nausea if you experience any of these symptoms during machine operation immediately shut off the machine and go outside for fresh air Have a qualified service technician test the machine for CO emissions before using it again High exposure to CO may result in vomiting confusion collapse loss of consciousness and muscle...

Page 8: ...ot enough during operation to cause severe burns these parts remain hot for a long time after the machine has been shut off do not touch WARNING these parts until they have cooled Safety goggles safety shoes and safety clothing are recommended while operating the machine Continuous exposure to high noise levels can cause hearing loss Hearing protection must be worn while the machine is in operatio...

Page 9: ...T9 PRO 7 ASL MACHINES USA 2018 ...

Page 10: ...8 T9 PRO ASL MACHINES USA 2018 ...

Page 11: ...T9 PRO 9 ASL MACHINES USA 2018 ...

Page 12: ...10 T9 PRO ASL MACHINES USA 2018 ...

Page 13: ...T9 PRO 11 ASL MACHINES USA 2018 ...

Page 14: ...12 T9 PRO ASL MACHINES USA 2018 ...

Page 15: ...T9 PRO 13 ASL MACHINES USA 2018 ...

Page 16: ...14 T9 PRO ASL MACHINES USA 2018 ...

Page 17: ...T9 PRO 15 ASL MACHINES USA 2018 ...

Page 18: ...16 T9 PRO ASL MACHINES USA 2018 ...

Page 19: ...T9 PRO 17 ASL MACHINES USA 2018 ...

Page 20: ... the chassis touch the ground and lay it flat 4 Apply grinding tooling onto the equipment and the basic steps on the following page 1 As shown in Figure 1 the equipment chassis is loaded with a polishing plate 2 Place desired tooling on machine utilizing the magnetic plates 3 After loading check whether the parts are complete once again 4 Install or tighten the handle clockwise rotate the black ro...

Page 21: ...sing the water valve as shown in figure 5 Below 8 If dry cutting ensure vacuum is properly connected as shown in figure 6 below FIGURE 5 FIGURE 6 9 Turn on the propane tank and start the motor by turning and holding the key to the start position until the motor starts as shown in figure 7 below FIGURE 7 10 Slowly increase the throttle speed until desired RPM setting is achieved ...

Page 22: ...structional information sheet designed to instruct operators on how to change their machine belts 2 Begin by loosening the four motor mount bolts 3 Loosen and remove the three heat shield bolts and the motor exhaust bolts in order to remove the heat shield Set heat shield and bolts in a safe place ...

Page 23: ...ew slide the motor to the rear of the machine 5 Remove belt by pulling belt off of pulley Replace belt and slide motor back forward by pulling Tighten the belt tension screw and check tension by hand The amount of play should be roughly Replace Heat Shield and tighten all motor mount bolts heat shield bolts and motor exhaust bolts ...

Page 24: ...e a half dry clean rag to clean the machine Pay attention to cleaning the machine surface after being used in wet environment Ensure to not power wash near seals or near electrical components 4 Check whether the machine and the accessories are in good condition and make necessary repair and maintenance before storage 5 Keep the machine in the clean and dry place and when storing place the handset ...

Page 25: ...ted by the engine manufacturer for the term specified by the engine manufacturer ASL Machines USA promises at their discretion to repair or replace any product or part s which examination proves to be defective in either workmanship or materials used ASL Machines USA must be notified directly within the warranty period This warranty does not cover damage or failure caused by abuse misuse neglect d...

Page 26: ...olishing The Pro 9 can also function as a burnisher to produce an incredible shine With the magnetic plates changing diamonds and metals become a simple task And through our integrated weight system head pressure can be adjusted by lifting the weight towards the front or the back of the machine New Clean Air Emissions Sensor Adjustable Swing Weight System Transportation Leg 3 Magnetic Plates Dust ...

Page 27: ...T9 PRO 25 ASL MACHINES USA 2018 NOTES ...

Page 28: ...T9 PRO OWNERS MANUAL ASL MACHINES USA 2018 9328 Wheatlands Rd Suite A Santee CA 92071 866 275 0446 info ASLMachinesUSA com ASLMachinesUSA com facebook com aslmachinesusa ...

Reviews: