6
EN
2.3. ASSEMBLY OF FRONT AND SIDE PANEL
!
2.1
2.2
8
4
2
x
3
a
b
4
CLICK
5
2.4. ALIGNMENT OF THE WORKPLACE
–10 mm
max.
+30 mm
with support frame
(optional)
2
3
2.5. COMMISSIONING
Testing before setup:
- Adequate ground loading capacity.
- Point loads on the 4 supports of the frame (technical data)!
- Make on site extraction air connection
Summary of Contents for GAP.095.090
Page 1: ...EP V 16516 03 10 2017 EN USER MANUAL Hazardous Materials Work Stations ...
Page 14: ...14 EN ...
Page 15: ...15 EN ...