background image

3 - INFORMATION ON INSTALLATION AND USE 

3.1 - PERMITTED USE

 

The instrument has been projected and 
manufactured as a measuring and control device 
to be used according to EN61010-1 for the 
altitudes operation until 2000 ms.

 

The use of the instrument for applications not 

expressly permitted by the above mentioned rule must adopt all the 
necessary protective measures. 
The instrument CAN NOT be used in dangerous environments 
(flammable or explosive) without adequate protection. 
The installer must ensure that EMC rules are respected, also after 
the instrument installation, if necessary using proper filters.

 

Whenever a failure or a malfunction of the device may cause 
dangerous situations for persons, thing or animals, please 
remember that the plant has to be equipped with additional devices 
which will guarantee safety. 

3.2 – MECHANICAL MOUNTING 

The instrument, in DIN case 72 x 72 mm, is designed for flush-in 
panel mounting.  
Make a hole 66,5 x 66,5 mm and insert the instrument, fixing it with 
the provided special brackets. 
We recommend that the gasket is mounted in order to obtain the 
front protection degree as declared. Avoid placing the instrument in 
environments with very high humidity levels or dirt that may create 
condensation or introduction of conductive substances into the 
instrument. 
Ensure adequate ventilation to the instrument and avoid installation 
in containers that house devices which may overheat or which may 
cause the instrument to function at a higher temperature than the 
one permitted and declared.   
Connect the instrument as far away as possible from sources of 
electromagnetic disturbances such as motors, power relays, relays, 
solenoid valves, etc. 

3.3 - ELECTRICAL CONNECTION 

Carry out the electrical wiring by connecting only one wire to each 
terminal, according to the following diagram, checking that the 
power supply is the same as that indicated on the instrument and 
that the load current absorption is no higher than the maximum 
electricity current permitted.  
As the instrument is built-in equipment with permanent connection 
inside housing, it is not equipped with either switches or internal 
devices to protect against overload of current: the installation will 
include an overload protection and a two-phase circuit-breaker, 
placed as near as possible to the instrument, and located in a 
position that can easily be reached by the user and marked as 
instrument disconnecting device which interrupts the power supply 
to the equipment. 
It is also recommended that the supply of all the electrical circuits 
connected to the instrument must be protect properly, using devices 
(ex. fuses) proportionate to the circulating currents.  
It is strongly recommended that cables with proper insulation, 
according to the working voltages and  temperatures, be used.  
Furthermore, the input cable of the probe has to be kept separate 
from line voltage wiring. If the input cable of the probe is screened, it 
has to be connected to the ground with only one side.  
We recommend that a check should be made that the parameters 
are those desired and that the application functions correctly before 
connecting the outputs to the actuators so as to avoid 
malfunctioning that may cause irregularities in the plant that could 
cause damage to people, things or animals. 

3.4 - ELECTRICAL WIRING DIAGRAM 

0 /1 ..5  V

0 ..5 0 /6 0   m V

0 /4 ..2 0   m A   A C T IV E

R E L A Y S   :8 A -A C 1 (3 A -A C 3 )/2 5 0 V A C

C

O U T 1

2 1

2 2

2 0

+

P t1 0 0

T C

1

2

3

P A S S IV E

4 ..2 0   m A

(2  w ire s )

P T C -N T C

+

-

g e n .

e x t.

+

I

N O

C

1 3

S U P P L Y

1 8

O U T 2

1 9

1 7

1 6

1 5

1 4

1 2

4 ..2 0   m A

S S R :8 m A /8 V D C

5

4

6

7

8

O U T   1 2   V D C

M a x   2 0   m A

A C T IV E

0 ...1   V

0 /2 ..1 0   V

N C

N O

4 - FUNCTIONS

 

4.1 - MEASURING AND VISUALIZATION

 

All the parameters referring measurements are contained in the 
group 

]

InP”. 

Depending on the model required the input accept: 

C

: Thermocouples temperature probes (J,K,S and Ascon 

Tecnologic ZIS Infrared sensors), mV signals (0... 50/60 mV, 12... 
60 mV), Thermoresistances PT100. 

E

: Thermocouples temperature probes (J,K,S and Ascon 

Tecnologic ZIS Infrared sensors), mV signals (0... 50/60 mV, 12... 
60 mV), Thermistors PTC and NTC. 

I

: normalized analogue signals 0/4... 20 mA 

V

: normalized analogue signals 0... 1 V, 0/1... 5 V, 0/2... 10 V 

Depending on the model, using par. 

“SEnS”, 

it’s possible to select 

the type of input probe, which can be : 
- for thermocouples J (J), K (CrAL), S (S) or for infrared sensors
serie Ascon Tecnologic ZIS with linearization J (Ir.J) or K (Ir.CA)
- for thermoresistances Pt100 IEC (Pt1) or thermistors PTC KTY81-
121 (Ptc) or NTC 103AT-2 (ntc)
- for normalised signals in current 0... 20 mA (0.20) or 4... 20 mA
(4.20)
- for normalised signals in tension 0... 1 V (0.1), 0... 5 V (0.5), 1... 5 V
(1.5), 0... 10 V (0.10) or 2... 10 V (2.10).
- for normalised signals in tension 0... 50 mV (0.50), 0... 60 mV
(0.60), 12... 60 mV (12.60).
We recommend to switch on and off the instrument when these
parameters are modified, in order to obtain a correct measuring.
For the instruments with input for temperature probes (tc, rtd) it’s
possible to select, through par. 

“Unit”,

 the unit of measurement

(°C,°F) and, through par. 

“dP” 

(Pt100, PTC and NTC only)

 

the

desired resolution (0=1°; 1=0,1°).
Instead, with regards to the instruments with normalised analogue
input signals, it is first necessary to program the desired resolution
on par. 

“dP”

  (0=1; 1=0,1; 2=0,01; 3=0,001) and then, on par.

"SSC"

, the value that the instrument must visualise at the beginning

of the scale (0/4 mA, 0/12 mV, 0/1 V o 0/2 V) and, on par. 

"FSC",

the value that the instrument must visualise at the end of the scale
(20 mA, 50 mV, 60 mV, 5 V or 10 V).
The instrument allows for measuring calibration, which may be used
to recalibrate the instrument according to application needs, by
using par. 

“OFSt”

 and 

“rot”.

Programming par. “rot”=1,000, in par. “OFSt” it is possible to set a
positive or negative offset that is simply added to the value read by
the probe before visualisation, which remains constant for all the
measurements.
If instead, it is desired that the offset set should not be constant for
all the measurements, it is possible to operate the calibration on
any two points.

Ascon Tecnologic - TLK 72 B - OPERATING INSTRUCTIONS -

 PAG. 3

Summary of Contents for TLK72 B

Page 1: ...LE ACTION PID CONTROL 4 7 AUTOTUNING FUNCTION 4 8 REACHING OF SET POINT AT CONTROLLED SPEED 4 9 ALARM OUTPUT FUNCTIONS 4 10 PARAMETERS CONFIGURATION BY A01 5 PROGRAMMABLE PARAMETERS TABLE 6 PROBLEMS M...

Page 2: ...ll the operating parameters and the functioning configuration parameters ATTENTION The instrument is programmed in factory with all the parameters to exception of the Set Point SP1 and the alarm thres...

Page 3: ...screened it has to be connected to the ground with only one side We recommend that a check should be made that the parameters are those desired and that the application functions correctly before con...

Page 4: ...symmetrical hysteresis if Cont On FA The control works in the following way in the case of reverse action or heating FunC HEAt it deactivates the output when the process value reaches SP1 HSEt in case...

Page 5: ...rEG and power of the element controlled by output 1 rEG 4 7 AUTOTUNING FUNCTION All the parameters referring to the AUTOTUNING function are contained in the group rEG The AUTO TUNING function FAST or...

Page 6: ...e while it is OFF when the alarm is active but with reverse led indication led ON alarm OFF Have now access at the group AL1 and program on par OAL1 to which output the alarm signal has to be sent The...

Page 7: ...indication led on the device A01 it has to result green because if the led results green blinking or red blinking this means that on the device it has not been downloaded any valid configuration and t...

Page 8: ...Once the error has been found try to repeat the auto tuning noAt Auto tuning not finished within 12 hours Check the functioning of probe and actuator and try to repeat the auto tuning ErEP Possible an...

Page 9: ...PANEL GASKET 9 BRACKETS AT ST SET Out1 Out2 4 20 mA SEnS 4 20 0 50 mV SEnS 0 50 0 60 mV SEnS 0 60 12 60 mV SEnS 12 60 0 1 V SEnS 0 1 0 5 V SEnS 0 5 1 5 V SEnS 1 5 0 10 V SEnS 0 10 2 10 V SEnS 2 10 7 6...

Reviews: