7
Contents
Chapter 1 General Information ……………………………………...................... 11
General Information………………………………………………………………… 11
Safety Considerations………………………………………………….. ………… ...11
Description……………………………………………………………...................... 11
Installation……………………………………………………………………………12
Initial Inspection……………………………………………………….......................12
Mechanical Check……………………………………………………………………12
Electrical Check……………………………………………………………………12
Temperature Control………………………………………………………………… 12
Rack Mounting……………………………………………………………………….13
Chapter 2 Initial Operation ………………………………………………………..14
Initial Operation ……………………………………………………………………..14
Preliminary Checkout………………………………………………………………..14
Power-Line Cord……………………………………………………………………..14
Fuse Replacement……………………………………………………………………15
Power-On Checkout………………………………………………………….16
Self-test started……………………………………………………………….16
Self-test accomplished………………………………………………………..16
Enabling the outputs…………………………………………………………..16
Output Checkout……………………………………………………………….17
Voltage Output Checkout………………………………………………………17
Current Output Checkout………………………………………………………18
Chapter 3 Front Panel Operation……………………………………………20
Front Panel Operation………………………………………………………….20
Front Panel Operation Overview………………………………………………...20
Output on/off…………………………………………………………………….20
Constant Voltage Output Setting…………………………………………………21
Connecting a load to the relevant output terminals………………………………...21
Turning on the power supply……………………………………………………….21
Setting desired output voltage……………………………………………………….21
Setting maximum current……………………………………………………………21
Enabling the outputs…………………………………………………………………22
Verifying that the power supply is in the constant voltage mode………………….22
Constant Current Output Setting…………………………………………………22
Connecting a load to the relevant output terminals………………………………….22
Turning on the power supply………………………………………………………..22
Maximum output voltage setting…………………………………………………..22
Setting the desired output current……………………………………………………23