# 48387H005
Page 5
Figure 7
To hang line set from joist or rafter,
use either metal strapping material
or anchored heavy nylon wire ties.
Strapping Material
(around vapor line only)
8
’
8
’
Tape or Wire Tie
Strap the vapor line to the joist or rafter
at 8 intervals then strap the liquid line
to the vapor line.
’
Floor Joist or
Roof Rafter
Metal Sleeve
Floor Joist or Roof Rafter
Tape or Wire Tie
Wire Tie
(around vapor line only)
Refrigerant Line Sets: Installing Horizontal Runs
Outside Unit Placement
and Installation
Figure 6
Install unit away
from windows
Two 90° elbows installed in lineset
will reduce lineset vibration
Following are some points to consider when placing and
installing a high-efficiency outdoor unit:
Placement
Be aware that some localities are adopting sound ordi-
nances based on how noisy the unit is at the neighbor’s
home, not at the original installation. Install the unit as far
as possible from the property line. When possible, do not
install the unit directly outside a bedroom window. Glass
has a very high level of sound transmission. Figure 6
shows how to place the outdoor unit and line set to reduce
line set vibration.
Line Set Isolation
Illustrations on this and the following pages demonstrate
procedures which ensure proper refrigerant line set
isolation. Figure 7 shows how to install line sets on
horizontal runs. On page 6, Figure 8 shows how to make
a transition from horizontal to vertical and Figure 9 shows