Installation
Breeze Mattress Overlay
Place the overlay on top of the base mattress, with the tubeset
located near the foot end of the bed. The cells of the overlay must
be uppermost.
Secure the overlay to the base mattress by
placing the apron under the foot end of the
mattress and securing the corner straps to
the head end.
Caution:
Do not use the overlay directly on the bed frame.
Breeze Mattress Replacement (MR)
Quick Start
When power is applied to the pump unit, the orange
standby indicator is illuminated. Pressing the
Power
button
on the control panel will activate the pump.
Allow approximately 3 minutes for the mattress/overlay
to inflate fully.
Make sure the turn valves are in the correct position (see
below), place a bed sheet over the overlay/MR and tuck
in loosely.
The pump will default to the Static mode providing
continuous low pressure.
Autofirm mode inflates the cells to their maximum pressure
to provide a stable surface for nursing procedures and/or
patient transfer. After 9 minutes an alarm will sound. After
10 minutes the mattress will revert to Static mode at the
previously set comfort level.
Pulsate mode provides a low pressure support surface
with a regular pulse.
Turn Valves
ArjoHuntleigh AB
Verkstadsvägen 5
241 38 Eslöv
SWEDEN
www.arjohuntleigh.com
® and ™ are trademarks of ArjoHuntleigh
As our policy is one of continuous improvement, we reserve the right to modify designs without prior notice.
624907EN_02: 10/2012
CPR Control
IN THE EVENT OF CARDIAC ARREST
In the event of a patient suffering cardiac arrest and
CPR needing to be administered:
To activate CPR
- Depress the red release catch on
the tubeset/pump connector and pull the tubeset away
from the pump.
To reset CPR
Reconnect the tubeset to the pump.
SAFETY SIDES
Regarding the use of safety sides, always refer to your local
trust policy AND the product instructions for use.
!
Place the MR directly onto the bed base, with the tubeset located
near the foot end of the bed. The cells of the mattress must be
uppermost.
Use the straps provided to make sure the MR is
secured to the moving parts of the bed platform.
To Complete the Mattress Installation
Zip the protective cover over the mattress/overlay. Make sure the
ArjoHuntleigh logo is uppermost and at the foot end of the mattress/
overlay.
Installing the Pump
Position the pump, feet down, on any convenient
horizontal surface or alternatively suspend from
the bed foot rail by means of the swing out
hooks.
Make sure the mattress tube-set is not “kinked” or twisted and
connect it to the pump until it clicks into place. Make sure the tube-
set is securely connected to the pump.
Insert the mains power plug into a suitable mains power socket.
Transport Mode
The patient may be transported on the Breeze Mattress Replacement
only, by turning off the pump and disconnecting it from the mains
power supply. The air-filled sub-mattress will provide temporary
support for up to six hours.
Do not disconnect the tubeset from the pump, as this deflates the
air-filled sub-mattress.
The six leg cells can be deflated individually using the Inline
Turn Valves. Each valve has two positions:
Open - Allows the cell to be inflated. Turn the valve so that
it points toward the head end of the mattress.
Closed - Deflates the cell. Turn the valve so that it points
toward the foot end of the mattress.