10
8. Routine Maintenance
Flowtron
Excel
System
Maintenance
The equipment has been designed to be maintenance-
free between service periods.
Servicing
ArjoHuntleigh
will make available on request service
manuals, component parts lists and other information
necessary for
ArjoHuntleigh
trained personnel to repair
the system.
Service Period
ArjoHuntleigh
recommends that the
Flowtron
Excel
pump is serviced every 12 months by an
ArjoHuntleigh
authorised service agent.
Flowtron
Excel Pump
General Care,
Maintenance and
Inspection
Check all electrical connections and power cable for
signs of excessive wear.
Check the tubeset and connectors for any damage.
In the event of the pump being subjected to abnormal
treatment, e.g. immersed in water or dropped, the unit
must be returned to an authorised service centre.
Serial Labels
The serial number for the pump is on the label on the
back of the pump case. Quote this serial number when
requesting service.
Summary of Contents for 247001
Page 2: ...This document has been translated based on 247933EN Rev 6 ...
Page 3: ...English Deutsch Español Français Ελληνικά Italiano Nederlands Svensk ...
Page 4: ......
Page 5: ...English ...
Page 7: ... ii ...
Page 28: ...Deutsch ...
Page 29: ......
Page 31: ... ii ...
Page 52: ...Español ...
Page 53: ......
Page 55: ... ii ...
Page 76: ...Français ...
Page 77: ......
Page 79: ... ii ...
Page 100: ...ΕΛΛΗΝΙΚΆ ...
Page 101: ......
Page 103: ... ii ...
Page 124: ...Italiano ...
Page 125: ......
Page 127: ... ii ...
Page 148: ...Nederlands ...
Page 149: ......
Page 151: ... ii ...
Page 172: ...Svensk ...
Page 173: ......
Page 175: ... ii ...
Page 196: ......
Page 197: ......
Page 198: ......