43
6.2.2 Removing the sealed chamber front cover
1. Remove the screws “C” (F
IG
. 6.5);
2. Lift the sealed chamber front cover from the locating
pins (F
IG
. 6.6).
F
IG
. 6.5
C
C
F
IG
. 6.6
6.2.3 Removing the side panels
1. Remove the four screws “D” for each side panel
(F
IG
.6.7);
2. Pull the panel away from the boiler at the base, then lift
the panel up and remove from the boiler.
D
D
D
F
IG
. 6.7
D
Summary of Contents for microGENUS HE 24 MFFI
Page 68: ...68 10 BENCHMARK COMMISSIONING CHECKLIST...
Page 69: ...69 11 SERVICE INTERVAL RECORD...
Page 70: ...70...
Page 71: ...71...