For the Republic of Ireland it is necessary to complete a
“Declaration of Conformity” to indicate compliance to I.S.
813. An example of this is given in the current edtion of
I.S. 813. In addition it is necessary to complete the
Commissioning Checklist, (Section 11, page 68).
3.10
O
PERATIONAL
C
HECKS
1. The flue system must be visibly checked for
soundness.
2. On Central Heating allow the system to warm up and
manipulate the Central Heating temperature control
knob, check the burner modulates up and down
between the high and low settings;
3. Range rate the thermal power for Central Heating, as
detailed in S
ECTION
4.2 (page 39);
4. Check and adjust the soft-light setting, as detailed in
S
ECTION
4.2 (page 39);
5. Run the Domestic Hot Water, manipulate the Domestic
Hot Water temperature control knob to check the
burner modulates up and down between the high and
low settings and check the gas rate at the meter;
6. Set the Domestic Hot Water flow rate;
7. Balance the Central Heating system until all return
temperatures are correct and equal;
8. Turn the ON/OFF button OFF, disconnect the gas
pressure gauge, retighten screw test for sondness and
relight boiler.
9. Re-examine Central Heating, Domestic Hot Water and
Cold Water supplies for soundness.
10.Check the appearance of the gas flame to assess the
adequacy of the combustion air supply.
11. If external controls have been disconnected,
reconnect and test.
12. Refit boiler casing.