49
maintenance
Instructions for opening the casing and performing an internal
inspection
Before performing any work on the boiler,
fi
rst disconnect it from the
electrical power supply using the external bipolar switch and shut o
ff
the gas valve.
To access the inside of the boiler, the following is necessary:
1. Loosen the two screws on the front casing (a), pull it forwards and
unhook it from the upper pins (b)
2. Rotate the control panel, pulling it forwards (c)
3. Unhook the two clips on the panel closing o
ff
the combustion
chamber. Pull it forwards and unhook it from the upper pins (d)
(a)
(c)
(d)
(b)
Summary of Contents for EGIS PREMIUM S 25
Page 3: ...3 CE CE 2009 142 CEE 2004 108 EC 92 42 CEE 2006 95 EC...
Page 4: ...4...
Page 5: ...5 OK ESC 1 2 3 4 6 7 5 Reset...
Page 8: ...8 F A B C D E I G H EGIS PREMIUM S 25 EGIS PREMIUM S 31...
Page 10: ...10 1 3 4 6 7 8 9 10 12 13 14 15 11 16 17 18 19 20 21 22 23 24...
Page 12: ...12 H05V2V2 F 60 N L...
Page 15: ...15 OK ESC...
Page 16: ...16 2 1 3 2 4 2 4 1...
Page 17: ...17 3 65 C 1 C02 4 C02 1 5 RESET Gas CO2 MAX G20 9 0 0 7 G31 10 0 0 7...
Page 18: ...18 31 25 231 220 236 1 5 222 2 234 3 4 220 5 231 6 70 7 75 8 OK ESC OK ESC 1 6...
Page 20: ...20 3 bar EEPROM 15 5 OK ESC...
Page 21: ...21...
Page 22: ...22 1 5 222 2 234 3 4 220 5 231 6 70 7 75 8 OK ESC ESC OK ESC 1 6...
Page 25: ...25 a c d b...
Page 26: ...26...