37
installation
Peripheral unit connection
To access peripheral unit connections carry out the following steps:
- Disconnect the boiler from the power supply
- Remove the casing by unhooking it from the instrument panel
- Rotate the control panel while pulling it forwards
- Unhook the two clips “a”, rotate the cover “b” to have access to the
peripherical connections
- Unscrew the two screws “c” and remove the cover “d” of the
instrument panel to have access to the main P.C.B.
a
b
c
d
Peripheral connections:
FLOOR =
Under
fl
oor heating thermostat
SE =
Outdoor sensor
SOL =
Solar temperature probe
TA1 =
Room thermostat 1
Room thermostat connection
- Introduce the thermostat wire
- Loosen the cable clamp using a screwdriver and insert the wires
leading from the room thermostat one at a time.
- Connect the wires to the terminals TA1, removing the jumper
- Make sure that they are well connected and that they are not subject
to traction when the control panel lid is opened or closed
- Close the
fl
ap again, then replace the control panel cover and the
front casing.
Caution!
For the connection and positioning of the wires belong-
ing to optional peripheral units, please refer to the
advice relating to the installation of these units.
TA2
FLOOR
SE
SOL TA1
T B
TA2
FLOOR
SE
SOL TA1
C
N1
S
on
d
a
E
s
terna
O
u
t
d
oor
s
en
s
or
T
ermo
s
tato
l
imite
im
p
ianti
a
p
a
v
imento
U
n
d
er
fl
oor
heating
thermo
s
tat
T
ermo
s
tato
A
mbiente
1
Room
T
hermo
s
tat
1
Summary of Contents for EGIS PREMIUM S 25
Page 3: ...3 CE CE 2009 142 CEE 2004 108 EC 92 42 CEE 2006 95 EC...
Page 4: ...4...
Page 5: ...5 OK ESC 1 2 3 4 6 7 5 Reset...
Page 8: ...8 F A B C D E I G H EGIS PREMIUM S 25 EGIS PREMIUM S 31...
Page 10: ...10 1 3 4 6 7 8 9 10 12 13 14 15 11 16 17 18 19 20 21 22 23 24...
Page 12: ...12 H05V2V2 F 60 N L...
Page 15: ...15 OK ESC...
Page 16: ...16 2 1 3 2 4 2 4 1...
Page 17: ...17 3 65 C 1 C02 4 C02 1 5 RESET Gas CO2 MAX G20 9 0 0 7 G31 10 0 0 7...
Page 18: ...18 31 25 231 220 236 1 5 222 2 234 3 4 220 5 231 6 70 7 75 8 OK ESC OK ESC 1 6...
Page 20: ...20 3 bar EEPROM 15 5 OK ESC...
Page 21: ...21...
Page 22: ...22 1 5 222 2 234 3 4 220 5 231 6 70 7 75 8 OK ESC ESC OK ESC 1 6...
Page 25: ...25 a c d b...
Page 26: ...26...