39
F
IG
. 3.12
Maximum Heating Power adjustment
2
2
The maximum heating power can be adjusted between the
maximum power allowed by the boiler (22.5kW - ACO 27 and
28kW - ACO 32) and the minimum recommended power (10kW
- ACO 27 and 13kW - ACO 32) indicated in the graph below
(Parameter
2
= 20%). The value is factory set to 70% of the
maximum power.
The value set (expressed as a percentage) can be displayed
and modified as illustrated in Section 3.6.1 (parameter 2).
The display shows the value between 100% ("00" on the display)
and 1% ("01").
Use the graph below as a guide to set the boiler heating power to
suit the system load.
N
OTE
: MTS
RECOMMEND THAT THE MINIMUM POWER NOT BE SET BELOW
20%
AS INDICATED IN THE GRAPH BELOW
.
.
Ignition Delay adjustment
3
3
The re-ignition delay for Central Heating can be adjusted to
between 0 and 7 minutes. The delay is factory set to 2
minutes.
The value set can be displayed and modified as illustrated in
Section 3.6.1 (parameter 3)
Maximum Central Heating temperature
5
5
This parameter allows the setting of the maximum temperature
for the central heating circuit. The value is factory set at 82°C
and can be adjusted as illustrated in Section 3.6.1 (parameter 5).
Minimum Central Heating temperature
4
4
This parameter allows the setting of the minimum temperature
for the central heating circuit. The value is factory set at 46°C
and can be adjusted as illustrated in Section 3.6.1 (parameter 4).
F
IG
. 3.13
F
IG
. 3.15
F
IG
. 3.14
Display
Heat
Output
ACO 27
ACO 32
Summary of Contents for ACO 27 MFFI
Page 49: ...49 WIRING DIAGRAM FOR CONNECTION TO AN ARISTON UNVENTED CYLINDER DIAGRAM A ...
Page 50: ...50 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Page 57: ...57 FIG 7 19 FIG 7 20 FIG 7 21 FIG 7 22 FIG 7 23 FIG 7 24 O P FIG 7 18 ...
Page 69: ...69 Model 27 32 RFFI SYSTEM ...
Page 70: ...70 ...
Page 71: ...71 ...
Page 77: ...77 ...
Page 78: ...78 11 BENCHMARK COMMISSIONING CHECKLIST ...
Page 79: ...79 12 SERVICE INTERVAL RECORD ...