![Arista DCS-7020TR-48 Quick Start Manual Download Page 23](http://html.mh-extra.com/html/arista/dcs-7020tr-48/dcs-7020tr-48_quick-start-manual_2970778023.webp)
Chapter 4: Cabling the Switch
Connecting Power Cables
Quick Start Guide: 7000 Series 1 RU-Gen 3 Data Center Switches
19
The power supplies require power cables that comply with IEC-320 and have a C13 plug. The
accessory kit provides two IEC-320 C13 to C14 power cables.
4.2.2
DC Power Supplies
The following two DC power supplies are supported.
•
PWR-1900-DC
•
PWR-500-DC
Figure 4-4: Supported DC power supplies
Important!
A disconnect device must be provided as part of the installation .
Un dispositif de sectionnement doit être fourni dans le cadre de l'installation.
Important!
Ensure power is removed from DC circuits before performing any installation actions. Locate the
disconnect device, circuit breakers or fuses on DC power lines servicing the circuits.
Turn off the power line circuits or remove the fuses.
Pouvoir assurer qu'il est retiré de circuits DC avant d'effectuer des actions d'installation . Localiser les
disjoncteurs ou des fusibles sur les lignes de courant continu desservant les circuits.
Coupez les circuits de lignes d'alimentation ou retirer les fusibles.
Important!
Wire size must comply with local and national requirements and electrical codes.
Use only copper wire.
Le calibre du fil doit être conforme aux exigences locales et nationales et les codes électriques.
Utiliser du fil de cuivre.
Important!
Apply ground connection to the switch first during installation and remove last when removing power.
Appliquer connexion à la terre à l'interrupteur premier lors de l'installation et de supprimer la dernière
alimentation lors du débranchement.