Maximum Allowable Working Pressure
All Ariel Compressor Cylinders have a “Maximum Allowable Working Pressure (MAWP)”.
The MAWP, the hydrostatic test pressure, and the test date are stamped on the end of every
Ariel cylinder.
24-HOUR POST START-UP CHECK LIST
Description
Date Checked
Date Verified
1.
Record "hot" alignment readings after reaching normal
operating temperatures and components become heat
soaked. Shutdown and vent gas system. Within 30 min-
utes and while components are still hot, record dial indica-
tor readings in inches (mm) at the 3, 6, 9 and 12 o’clock
positions on lines provided below:
If using a laser alignment tool, make a print out and
attach it to this document.
Commissioning Agent:
__________________
Distributor:
___________
2.
If using a discharge bottle or head end cylinder supports,
adjust when components are heat soaked to ensure no
excessive forces exist to cause detrimental cylinder deflec-
tion.
Commissioning Agent:
__________________
Distributor:
___________
3.
Check and verify torque on gas nozzle flange, valve cap,
cylinder head, compressor rod packing flange, and guide
to frame bolting.
Commissioning Agent:
__________________
Distributor:
___________
4.
Complete Ariel’s “Compressor Warranty Notification -
Installation List Data” (pages 1 and 2).
Commissioning Agent:
__________________
Distributor:
___________
750-HOUR POST START-UP CHECK LIST
Description
Date Checked
Date Verified
1.
Check and verify torque on gas nozzle flange, valve cap,
cylinder head, and compressor rod packing flange bolting.
Commissioning Agent:
__________________
Distributor:
___________
2.
Send completed form and check lists (pages 1-12) to Ariel
as noted on page 1.
Commissioning Agent:
__________________
Distributor:
___________
CAUTION
OPERATING CONDITIONS MUST NOT EXCEED CYLINDER
DESIGN LIMITATIONS.