40
Turn rim over and spoon tire onto lip of opposite side. Figure
7-24. Place second rim ring into position as described in previ-
ous steps and install fasteners. Torque to 7.2 ft.lbs. (10Nm).
Fill to 10 psi and check for leaks. Set final air pressure to
1.5 - 2.0 psi.
Figure 7-24. Mount tire opposite side.
7.2.8 AXLE BEARING MOUNTING
The axles are mounted to your Frontier using special cork
gaskets between the flanged bearings and the outside
surface of the lower body. During the initial run-in period,
the gasket material may relax causing the nuts to loosen
slightly. These should be checked and re-tightened after
initial 8 hours of use and then after every 100 hours.
Figure 7-25 Mid Axle Locations. Figure 7-26 Front & Rear
Bearing Extension Location (if applicable)
Figure 7-25. Bearing Flange and Cork Gasket
Figure 7-26. Bearing Flange and Cork Gasket
SECTION 7
MAINTENANCE INFORMATION
Install tire to rim, pushing bead over rim lip. Figure 7-21.
Figure 7-21. Install tire to rim.
Ensure the tire bead is seated properly into the rim lip around
the entire perimeter of the rim (see Figure 7-15), before
placing the rim ring into position to the top of the tire bead.
Align machined edges of rim ring with machined edges of
rim. Figure 7-22.
Figure 7-22. Align rim ring with rim.
Install (10) fasteners to all locations around tire/rim assembly
and torque to 7.2 ft.lbs (10 Nm). Torque in a cross pattern
sequence. Do NOT over-torque. Figure 7-23.
Figure 7-23. Install fasteners.
Summary of Contents for Frontier 600 6x6
Page 70: ...62 NOTES...
Page 71: ...63 NOTES...