SETUP
"BASIC SETTINGS"
4B - GUIDED SETUP PROCEDURE FOR MACHINES WITH TOWED / 3-POINT HITCH IMPLEMENT
- From the "Home" page press
F8
.
- Select
Implement
(Fig. 54) and press
OK
.
Fig. 54
Implement > Start
- Delta 80 guides you through the setup procedure: follow all suggested steps and select required
options.
OK
: next step
ESC
: previous step.
- When message
Press Ok to confirm selected settings
is displayed, setup is completed.
Press
OK
.
- Press
ESC
and return to the
Settings
menu.
- Now select
Tractor
to start guided setup procedure as shown in Fig. 58.
Fig. 55
Fig. 56
OK
Next step
ESC
Previous step
Fig. 57
BASIC IMPLEMENT SETTINGS
• IMPLEMENT TYPE
Sprayer (Seletron)
: system with Seletron valves.
Sprayer (Electrovalves)
: system with electric-activated valves - with gearmotor.
• MAIN VALVE
Main control valve installed on the control unit:
None
2 ways
(drain valve)
3 ways
(main valve)
• SPRAYING SPOT TYPE
Seletron type: single, twin or fourfold
• FLOWRATE REFERENCE SENSOR
Device used to calculate flowrate:
Flowmeter
Pressure sensor
: measured pressure is used to calculate application rate.
Both
: within the working limits the computer uses the flowmeter, otherwise it uses the pressure sensor, ONLY if properly configured.
• TERMINAL NOZZLES
None
"Buffer zone" nozzles
: use switch panel to select nozzle to be used at "Buffer zone", see par. 12.2.1 "Buffer Zone" function enabled on page 74.
• TANK LEVEL SOURCE
Device used to read tank level:
Manual
: no device connected
Filling flowmeter
Tank level sensor
CONTINUES
Par.
Confirm access
or data change
Exit the function or
data change
Delete
selected
character
Scroll
(LEFT /
RIGHT)
Data
increase /
decrease
Scroll
(UP /
DOWN)
Enter