background image

Problem

Cause

Solution

1. Power Light Not Illuminated

No AC power

Check GFI and incoming power

Debris stuck on Probe

Remove Probe and clean debris and any scale build-up off bars

Controller failure

Contact Dealer or Installer

2. Ionizing Light Illuminated Red

Probe exhausted

Inspect and replace Probe if exhausted

3.  Ionization light flashing green or 

not able to raise ionization level to 

maximum bars

Insufficient water flow 

through flow chamber

Make sure the Probe is receiving enough water flow. Make sure red dot on top of Probe fitting is in line with the direction 

of the water flow through the flow chamber.
Move Probe to area of greater water flow. Plumbing into the water feature’s recirculating system is the most effective 

method. If the Flow Chamber is set in the skimmer or pump vault you can remove the probe fitting from the Flow Chamber 

and submerge the bare Probe into skimmer or pump vault. This will further improve flow across the Probe’s bars.
The red dot on the top of the Probe fitting indicates proper orientation of the Probe when installed into the Flow 

Chamber. Make sure the red dot is lined up with the direction of the water flow through the Flow Chamber. Proper 

orientation of the Probe will maximize the IonGen’s

 performance. 

(See Fig. 7 on page 4)

Debris stuck on Probe

Remove Probe and clean debris and any scale build-up off bars

4.  Continued Scale Build-up  

on Probe Bars

Insufficient water  

flow across Probe

See #3 Ionization light flashing green or not able to raise ionization level to maximum bars.

5. Low Copper Level

Ionizing level set too low

Raise Ionizing level

Insufficient flow through  

Flow Chamber

Increase pump run time or move Flow Chamber to higher flow location

Probe exhausted

Inspect and replace Probe if exhausted

6. High Copper Level

Ionizing level  

set too high

Reduce ionizing indicator to 1 bar or unplug Control Panel until copper level is below 0.25 ppm.  

A partial water change can also be conducted for quicker copper level decrease.

7. Cloudy Water/Excessive Debris

Low copper level

Raise ionization level 

Insufficient flow through  

Flow Chamber

Increase pump run time or move Flow Chamber to higher flow location

Debris stuck on Probe

Remove Probe and clean debris and any scale build-up off bars

Outside of targeted  

water parameters

See Targeted Water Parameters table

5

Fig. 12

Fig. 13

Example of a 

deteriorated probe.

ImPOrTANT:

 Before starting the IonGen

 on existing water features, it is recommended to thoroughly clean the pond of as much debris as  

possible. This will maximize the ion’s effectiveness, speed to achieve desired results and ability to raise the ions up to the proper level. The more  

debris and dirtier the water feature, the longer it will take for the IonGen

 to provide noticeable results.

• It is recommended to shut  

down the IonGen

 System  

in regions that have climates 

that experience cold-freezing 

temperatures.  This will help  

save the life of the probe for  

the warmer months.

•  The Control Panel is weather 

resistant, but steps to protect 

it from the elements, such as 

mounting the panel above the 

ground, are recommended to 

maximize its lifespan.   

•  The Flow Chamber, when 

plumbed directly into the 

recirculating system, needs to be 

located in a region that will drain 

for servicing the replaceable 

IonGen

 Probe, as well as 

allowing the Flow Chamber  

fitting to over-winter.

• If shutting down the water 

feature during the winter, make 

sure the plumbing line is drained 

free of water.  Failure to do this 

may cause water remaining 

in the plumbing line to freeze, 

potentially cracking the  

Flow Chamber.

•  The Flow Chamber, when set  

in the skimmer or inside the  

 

pond, should be removed  

and stored inside.

•  Prior to restarting the IonGen

 

it is a good idea to remove and 

inspect the Probe to make sure 

it is free of debris and scale 

build-up and not close to being 

exhausted.  Scrape away any scale 

build-up from the Probe’s bars. 

Replace Probe if it appears to be 

close to exhausted.  

(See Fig. 13)

Winterization

Troubleshooting Guide

replacing the Probe

Disconnect the waterproof  

connector at the top of the  

Flow Chamber and remove  

and inspect the IonGen

 Probe for 

significant deterioration. Replace if 

necessary. 

(See Fig. 12 and 13)

Note:

 

It is good practice once a  

year or at the beginning of the 

water garden season to manually 

inspect the IonGen

 Probe.

Clean off any debris or scale  

build-up during inspection.

Continued on page 6

Summary of Contents for IonGen

Page 1: ...n Installation Instructions Maintenance Owner s Manual Made in U S A Aquascape Inc St Charles IL 60174 Brampton ON L6T 5V7 www aquascapeinc com Electronic Clarifier for Ponds and Pondless Waterfall Sy...

Page 2: ...polarity to prevent scale and debris build up on the Probe s bars The metal alloys in the Probe are scientifically blended and tested to produce maximum results The IonGen when used according to the...

Page 3: ...g the replaceable Probe and overwintering the fitting It is recommended to use a pre filter such as a skimmer prior to the Flow Chamber in order to remove solids and debris that may interfere with the...

Page 4: ...s output The ionizing light will flash RED when the Probe is exhausted or the Control Panel indicates a problem See Troubleshooting Table for more information on the RED Ionizing light The Replaceable...

Page 5: ...Flow Chamber Increase pump run time or move Flow Chamber to higher flow location Debris stuck on Probe Remove Probe and clean debris and any scale build up off bars Outside of targeted water parameter...

Page 6: ...y Serial Number or S N is located on white label on cord Manufacture setting in Control Panel needs to be adjusted Remove back panel of Control Panel and turn the blue potentiometer screw clockwise un...

Page 7: ...e passion 7 Guide d installation et manuel d utilisation Fabriqu aux tats Unis Aquascape Inc St Charles IL 60174 Brampton ON L6T 5V7 www aquascapeinc com Clarificateur lectronique pour bassins et casc...

Page 8: ...ent l entartrage et l accumulation de d bris sur les lectrodes L alliage m tallique des lectrodes est scientifiquement dos et test pour donner des r sultats optimaux Le clarificateur IonGenMC lorsqu u...

Page 9: ...o il y a un bon d bit d eau comme dans le bo tier de l cumoire ou le bord d une cascade Assurez vous que le connecteur des lectrodes atteigne la chambre d ionisation Suivez le guide tape par tape pou...

Page 10: ...que les taux de cuivre demeurent sous 0 25 ppm Si la concentration de cuivre d passe 0 25 ppm r duisez le clarificateur IonGenMC une barre sur le voyant d ionisation ou d branchez le jusqu ce que les...

Page 11: ...Remplacez une partie de l eau par de l eau fra che pour faire baisser plus rapidement la concentration de cuivre 7 L eau est trouble importante quantit de d bris D bit d eau insuffisant dans la chambr...

Page 12: ...trois saisons selon l usage qui en est fait la quantit d eau traiter et les param tres de l am nagement aquatique Le voyant d ionisation qui est normalement au VERT se met clignoter en rouge lorsqu i...

Reviews: