12
VCS - Viscomaster™
3.1.5
Perform a pre-installation meter check
1. Remove the meter from the box.
CAUTION!
Handle the meter with care. Follow all corporate, local, and national
safety regulations for lifting and moving the meter.
2. Visually inspect the meter for any physical damage. If you notice any physical damage to the meter,
immediately contact Aquametro Oil & Marine support at [email protected].
3. Connect the power wiring, and power up the meter. Remove the back transmitter housing cover to
access the PWR terminals.
4. If you have an HFVM with calibration code B (viscosity and density calibration), perform a Known
Density Verification (KDV) check. Use the Known Density Verification procedure to match the current
meter calibration with the factory calibration. If the meter passes the test, then it has not drifted or
changed during shipment.
3.2
Mounting
Topics covered in this chapter:
Prepare the installation
Mount the meter
Install thermal insulation
Rotate the electronics on the meter (optional)
Rotate the display on the transmitter (optional)
Summary of Contents for Viscomaster
Page 35: ...VCS Viscomaster 35 ...
Page 36: ...36 VCS Viscomaster ...
Page 37: ...VCS Viscomaster 37 For connection with external power supply controller and sensor passive ...
Page 38: ...38 VCS Viscomaster ...
Page 39: ...VCS Viscomaster 39 ...
Page 47: ...VCS Viscomaster 47 ...