Rise Digital Bath
installation instuctions
page 7
Choose the position for your Digital processor as close to the
bath control as possible.
The processor may be sited in the roof space above the proposed
bath site, in the airing cupboard or behind a screwed bath panel
if more convenient. If siting in the roof space, ensure that
freezing cannot occur and that no insulation material is placed
under or over the processor. Please refer to the system layout
diagrams overleaf.
3
!
The distance between the Digital processor and bath control
must be within range of the 10m data cable supplied.
THE PROCESSOR MUST BE SITED IN A POSITION THAT IS SAFELY
ACCESSIBLE FOR SERVICING AND COMMISSIONING PURPOSES.
WHEN FITTED IN THE LOFT SPACE, THE ROUTE TO AND THE AREA
AROUND THE PROCESSOR MUST BE BOARDED TO ENSURE SAFE
WORKING ENVIRONMENT
Place the Digital processor on a solid
mounting surface, and place the fixing
feet into suitable positions. Mark then
drill and prepare suitable fixings before
securing the processor to the mounting
surface using the screws provided.
4
Flush out the hot and cold supply pipes.
5
The maximum hot water inlet temperature must be no more
than 65˚C.
!
Attach the supply pipes to the Digital
processor, ensuring that the cold and
hot feeds are fitted into the
appropriately marked inlets.
6
DO NOT SOLDER NEAR TO PLASTIC COMPONENTS.
!
Run a pipe from the mixed water outlet on the Digital processor through
to the proposed siting for the bath fill outlet.
7
Suitable non restrictive double check valves (not supplied) MUST
be fitted to the blended outlet pipe in line with current Water
Supply Regulations.
!