
Rise Digital Bath
installation instuctions
page 16
Supply
Vent and draw-off
pipe to hot water
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
NB: THE BASE OF THE PROCESSOR
MUST BE SITED NO HIGHER THAN
THE BASE LEVEL OF THE CISTERN
10m
max
Digital
shower
control
Supply
Hot water
cylinder
10m
max
Digital
shower
control
10m
max
Digital
shower
control
Central
heating
boiler
Supply
Typical gravity system installation
(compatible with pumped processor)
T
Typical HP system installation
(compatible with standard processor)
Typical thermal storage unit system installation
(compatible with standard processor)
T
Typical installations
Supply
Pressure
reducing valve
if required
10m
max
Digital
shower
control
Supply
Vent and draw-off
pipe to hot water
Underside of cistern
Hot water
cylinder
NB: 1.5 bar MINIMUM pump rating
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
Digital
shower
control
Typical combination boiler installation
(compatible with standard processor)
T
Typical pumped system installation
(compatible with standard processor)