Quartz Digital exposed with adjustable head
installation instructions
Page 8
Flush out the hot and cold supply pipes.
5
The maximum hot water inlet temperature must be no more than 65°C.
!
Place the Digital processor on a solid mounting
surface, adjusting the fixing feet into suitable
positions. Mark then drill and prepare suitable
fixings before securing the processor to the
mounting surface using the screws provided.
4
Choose the position for your Digital processor
as close to the shower control as possible. The
processor may be sited in the roof space above
the proposed shower site, in the airing cupboard
or behind a screwed bath panel if more
convenient. If siting in the roof space, ensure
that freezing cannot occur and that no insulation
material is placed under or over the processor.
Please refer to the system layout diagrams.
3
!
THE PROCESSOR MUST BE SITED IN A POSITION THAT IS SAFELY
ACCESSIBLE FOR SERVICING AND COMMISSIONING PURPOSES. WHEN
FITTED IN THE LOFT SPACE, THE ROUTE TO AND THE AREA AROUND THE
PROCESSOR MUST BE BOARDED TO ENSURE A SAFE WORKING
ENVIRONMENT.
The optimum position for the Digital processor is in the roof space above the
shower site to take full advantage of the ease and speed of installation –
please refer to the note above.
The distance between the Digital processor and shower control must be
within range of the 10m data cable supplied.