Quartz Digital exposed with adjustable head
installation instructions
Page 13
Connect the low voltage data cable into the
socket adjacent to the temperature adjuster
as indicated on the label. Feed the cable out of
the processor box ensuring it is correctly
routed within the data cable channel.
22
A further data cable socket has been provided
for use with the secondary Digital remote
control or Digital diverter. This can be accessed by carefully snapping and
removing the entry pillar and connecting the cable as described above.
!
Unscrew the single fixing on top of the
processor box and then carefully tilt the lid up
and off the location lugs and pull the lid clear.
21
Connect the power to the processor and press
the ‘Start/stop’ button on the controller to turn
the shower on. Ensuring the hose washers are
fitted at either end of the shower hose, attach
the hose and flush the system through for 15
seconds to clear any debris. Turn the shower off
and isolate from the electricity supply.
23