12
13
The installation may now be checked for leaks. Push the on/off knob onto the front of
the valve fully home and turn the knob fully clockwise to ensure the valve is fully
turned off.
14
Turn on the supplies and check for any leaks upstream of the valve. Slowly open the control and check for
leaks downstream of the valve. If all is sound, turn off the on/off knob fully, turn off the supplies and
remove the on/off knob.
15
Place the mortar guard around the valve and fill in the chase. Once the in-filling
material has set, carefully remove the polystyrene to expose the valve body.
!
THE MORTAR GUARD MUST BE USED
16
Refit the red temperature preset override ring and the white temperature preset
location ring if removed prior to installation, taking care to fit the override ring in
the correct orientation as outlined in step 4. Before replacing the shroud, ensure
the shroud seal is in position as indicated.
Shroud seal
Shroud support ring
17
Replace the shroud ensuring that it is fully fitted against the shroud support ring as
shown.
18
Using a silicone based lubricant or liquid soap, lubricate the wall plate seal. Apply a
thin bead of silicone mastic into the groove on the rear of the wall plate and carefully
push the wall plate into position flush with the wall ensuring correct orientation of the
temperature markings.
12
Using a suitable tool, tighten both the elbow nuts and outlet connector nut until water tight.
Colt installation guide:Dolphin install Guide 14/1/11 11:17 Page 12
Summary of Contents for Colt
Page 1: ...Colt Thermostatic mixer shower with 90mm Harmony head Installation guide ...
Page 2: ......
Page 23: ......