Program Setup
4
Press
“NEXT”
and
buttons simultaneously for 3 sec-
onds. If screen in Set Softening does not appear in 5
seconds the lock on the valve is activated. To unlock
press
,
“NEXT”
,
, and
“SET CLOCK”
in sequence,
then press
“NEXT”
and
simultaneously for 3 sec-
onds.
Choose Softening using
or
buttons. Press
“NEXT”
to go to Refill option. Press
“REGEN”
to exit Softener
System Setup.
Set Refill option using
or
buttons:
•
“PoST”
to refill the brine tank after the final rinse; or
•
“PrE”
to refill the brine tank two hours before the
regeneration time set.
Press
“NEXT”
to go to Program Code. Press
“REGEN”
to return to previous step.
Enter the desired program code from Page 5 or 6. Prior
to selecting a Program Code, verify the correct valve
body, main piston, regenerant piston, and stack are
being used, and that the injector or injector plug(s) are
in the correct locations. See page 28.
Note:
Do not select P60 through P65 if using a
1
1
/
4
" CS valve.
Press
“NEXT”
to go to Set hardness, Press
“REGEN”
to
return to previous step.
NOTE:
The programming on this page is for the
programmable cycle valves
only.
To determine if the control valve has programmable cycles, press “NEXT” and “REGEN” simul-
taneously. The board version will appear, if the board version starts with a “1” it is a standard
electronics board, go to page 8 to continue setting up the control valve.
If the version begins with a “4” it has a programmable cycles, continue with the programming
on this page to set up the control valve.