9
Control Start-Up Procedures
Final Setup
In normal operation the Time Of Day will be displayed.
The Volume Remaining Display can be viewed by simply
pressing the "NEXT" button. This display will be in gal-
lons. As treated water is used, the Volume Remaining
Display will count down from a maximum value to zero
or (--.--). Once this occurs a regeneration cycle will then
be initiated immediately or delayed to the set
Regeneration Time. Water flow through the valve is indi-
cated by the flashing "SOFTENING" or "FILTERING"
indication on the display screen as the turbine rotates. See
illustration.
With proper valve operation verified:
A. Add water to the top of the air check. Manually step
the valve to the BRINE Mode and allow the valve to
draw water from the brine tank until it stops. Note:
The air check will check at approximately the mid-
point of the screened intake area.
B. Next, manually step the valve to the FILL Mode
Position and allow the valve to return to Service auto-
matically.
C. With the valve in SERVICE, check that there is about
1.0" of water above the grid in the brine tank, if used.
D. Fill the brine tank with salt.
E. Set-Up is now finished, the control can now be left to
run automatically.
Flow Meters
In normal operation the Time Of Day display will be
viewed at all times. The control will operate normally
until the number of days since the last regeneration reach-
es the Regeneration Day Override setting. Once this
occurs, a regeneration cycle will then be initiated at the
preset Regeneration Time.
Time Clock Valves