Page - 41
Connecting Switch
Dry Contact Connection Points to the
Microprocessor
1. Deactivate power to heat pump.
2. Plumb the switch as indicated in accessories installation
instructions.
3. Remove heat pump electrical access panel.
4. Using two of the three wires from the installed switch, route
wires to the low voltage side of the electrical enclosure. The
third wire is not used. Follow all National Electric Codes
(NEC) unless State or Local guidelines supersede.
5. Connect the wires to the jumper provided. Polarity is not
important.
6. Reattach heat pump access panel.
7. Apply power to heat pump.
8. Configure the heat pump to accept the pool/spa relay switch.
Configuring Switch
Enter "Installer Menus", then proceed
1
-
Ins
ta
lla
tion
Summary of Contents for GBB
Page 2: ......
Page 25: ...Page 21 Configure Call Flex Enter Installer Menus then proceed 1 Installation...
Page 29: ...Page 25 1 Installation...
Page 32: ...Page 28 1 Installation...
Page 36: ...Page 32 1 Installation...
Page 37: ...Page 33 Configure for Scheduled Mode Enter Installer Menus then proceed 1 Installation...
Page 41: ...Page 37 1 Installation...
Page 43: ...Page 39 1 Installation...
Page 46: ...Page 42 1 Installation...
Page 50: ...Page 46 1 Installation...
Page 53: ...Page 49 1 Installation...
Page 55: ...Page 51 1 Installation...
Page 74: ...Page 70 l Follow all National Electric Codes NEC and or State and Local guidelines 3 Appendix...
Page 77: ......
Page 78: ......