Page - 16
Minimum and Maximum Operating Voltage
The heat pump must operate within specified voltages.
NOTICE
Failure to heed the following may result in damage to equipment.
l
Operating equipment under higher or lower voltage conditions may result in damage to your compressor, motors
or other electrical components. This damage will not be covered by the product warranty.
1. Measure site voltage. The site voltage
MUST
be measured under “FULL LOAD” conditions. Activate all
equipment using the same electrical panel as the heat pump.
2. If measured site voltage is outside listed ranges, immediately deactivate equipment until site conditions have been
corrected. If unsure of heat pump equipment rating, please
Identifying Model Specifications
Equipment Rating
Minimum
Site Voltage
Maximum
Site Voltage
B Voltage
(208 to 230 Volts)
Three Phase 60 hertz
200 Volts
253 Volts
D Voltage
(380 to 420 Volts)
Three Phase 50 hertz
361 Volts
441 Volts
G Voltage
(460 Volts)
Three Phase 60 hertz
437 Volts
483 Volts
PLEASE NOTE
ICM Digital
Three-Phase
Monitor
The Great Big Bopper
®
heat pump comes with an ICM phase-rotation
monitor located inside the electrical panel.
The device protects the heat pump by preventing operation during
abnormal voltage conditions.
l
If the unit fails to operate, a qualified technician should check the
phase rotation monitor for faults preventing operation. Complete
instructions for the ICM phase monitor are in the appendix.
1
-
Ins
ta
ll
at
ion
Summary of Contents for GBB
Page 2: ......
Page 25: ...Page 21 Configure Call Flex Enter Installer Menus then proceed 1 Installation...
Page 29: ...Page 25 1 Installation...
Page 32: ...Page 28 1 Installation...
Page 36: ...Page 32 1 Installation...
Page 37: ...Page 33 Configure for Scheduled Mode Enter Installer Menus then proceed 1 Installation...
Page 41: ...Page 37 1 Installation...
Page 43: ...Page 39 1 Installation...
Page 46: ...Page 42 1 Installation...
Page 50: ...Page 46 1 Installation...
Page 53: ...Page 49 1 Installation...
Page 55: ...Page 51 1 Installation...
Page 74: ...Page 70 l Follow all National Electric Codes NEC and or State and Local guidelines 3 Appendix...
Page 77: ......
Page 78: ......