![AQC MAXAIR Manual Download Page 18](http://html1.mh-extra.com/html/aqc/maxair/maxair_manual_2957889018.webp)
Fume Arms
18
screws
10 START UP
10.1 Check list
Prior to using the fume arm for the first time, the check list
must be followed to ensure a proper continuous operation.
1.
Ensure arm moves freely and stays in esired position.
2 .
Ensure arm is bolted correctly to support bracket
3.
Open and close arm damper to make sure it operates
properly
4 .
Move arm left and right to ensure it does not hit posts or
walls
5.
Move arm up to make sure it does not hit lights or ceiling.
6.
Ensure all ductwork is sealed and installed properly.
7.
If arm is supplied with MAXIDRIVE exhaust fan, start
fan for only 5 seconds and listen for grinding or unusual
noise. If fan runs smoothly, you may start using the
system. Refer to MAXIDRIVE instruction manual if you
need instructions.
11 LIGHT KIT PARTS LIST AND INSTALLATION
Note :
Light kit and fan switch operate on 24 A.C. 25' (7.7
meters) of low voltage cable is supplied.
Light kits and fan switches are factory installed on the fume
arm hoods when ordered with such. Field installation is also
possible. AQC will supply instruction procedure if light kit or fan
switch is ordered once the fume arm is installed.
1.
Wire set
2.
LED light 24VAC/35W
3.
O-ring seal
4.
Protective glass
5.
Mounting plate
6 .
Bolts
7 .
Control switches (fan and light)
8.
Hood
9.
Wire seal
10 .
Shield
11 .
Light kit dome
Note :
If light blinks, ensure wiring and bulb screws
are tightened.
1
7
8
10
11
9
2
3
4
5
6