Page 18
Original operating manual LF 600 M1
APV – Technische Produkte GmbH
Procedure
To connect the hoses to the distributor:
Step
Description
Illustration
1
Using a sharp cutting tool, cut hose sections from the hose
roll in the equal lengths required respectively. The cut edge
on the hose must be at 90°.
2
Insert the cut-off hoses into the plug connections on the
distributor up to the end stop and pull lightly to make sure
they are firmly attached.
3
At the other end, the hoses are fastened to the nozzle
holders using plug connectors. Between the distributor and
nozzle holder, a hose needs to be severed and connected
to the pressure gauge using a T-piece and another piece of
hose.
4
The feed line between the pump unit and distributor must
be adjusted to the desired length. It can be closed off at the
pump unit using the quick fastener when uncoupling the soil
tillage implement.