APS LSE-D16 Manual Download Page 2

 

Safety regulations 

Before  the  installation  of  the  LSE-D16  Indicator  unit  read  these  instructions 
carefully  and  completely.  Improper  handling  can  result  in  severe  personal 
injury, substantial property damage or even death. 
 

Cleaning 

Before cleaning first disconnect the equipment from the mains. Do not use any 
liquid cleaner or corrosive agent but solely a dampened cloth. 
 

Installation 

Installation work must be carried out by certified technical staff only. Follow the 
instructions in this handbook. Observe the locally applicable regulations for the 
safe and riskless handling of electrical installations 
 

Supplementary power 

Power  supplies  for  the  LSE-D16  Indicator  unit  must  comply  with  the 
stipulations  for  safety  extra-low  voltage  (SELV)  given  in  IEC  346-4-41.  We 
recommend  our  power  supplies  of  the  EcoPower  Series  as  they  fulfil  these 
stipulations completely 
 

Please note:  
If the unit is supplied with AC the system outputs LT/LQ/HQ are disabled. 

 

Switching on the system 

The LSE-D16 Indicator unit has no master switch. The system is alive as soon 
as the power supply has been switched on. 
A switch must be provided in the building installation as a cut-off device. The 
switch must be labelled appropriately, must be in the vicinity of the equipment 
and must be easily accessible to the user. 

 

Mounting  

Firstly,  the  front  cut-out  of  138  x  68  mm  must  be  made.  Then  slide  the  LSE-
D16 Indicator unit trough the cut-out and fix the mounting clips. Finally, tighten 
the screws of the mounting clips.  
All electrical connections are effected by the plug-in screw terminals 

Summary of Contents for LSE-D16

Page 1: ...R UNIT LSE D16 24 AB MANUAL Safety regulations Mounting page 02 Schematics page 03 Control elements Technical data page 04 Programming page 05 Functionality page 09 Factory settings page 10 www aps sy...

Page 2: ...ply with the stipulations for safety extra low voltage SELV given in IEC 346 4 41 We recommend our power supplies of the EcoPower Series as they fulfil these stipulations completely Please note If the...

Page 3: ...ing a DC power supply The LT LQ and HQ functions can be customised see page 9 output functions The outputs are designed as a current sink and are not potential free If potential free contacts are requ...

Page 4: ...NC All inputs separate System inputs Buzzer HQ Lamp Lamp test LQ Lamp System outputs DC operation onl Buttons HQ LQ LT Optional output functions Common Common Priority 2 Output Control elements Horn...

Page 5: ...pressed for 30 seconds LSE D16 will return to operating mode and will take over the programming The programming mode can be ended by pushing the HQ and LT keys The settings are saved While the progra...

Page 6: ...to set if the inputs of group 1 are a NO closing contact or a NC opening contact The green flashing LED signals the selected fault indicator input The LQ key is used to switch the function Red LED of...

Page 7: ...ch on delay 2 On 3 Off Inner buzzer on 3 On Inner buzzer off 4 4 5 Off LQ output as the image of the LQ key active for 500 ms 5 On LQ output as collective indicator 6 Off According operation LED suppr...

Page 8: ...iority 2 Level 5 Signalisation Power LED blinking green LQ LED blinking yellow In level 5 the LED colour can be selected separately for each input of group 1 The inputs of group 1 light up in the prev...

Page 9: ...en LT button is pressed Common Output Prio 2 for inputs of group 1 Level 3 DIP 16 Level 4 9 HQ Output active for 500ms when LT button is pressed 10 LQ Output active for 500ms when LT button is pressed...

Page 10: ...evel 5 LED Colour for all inputs of group 1 red Level 6 LED Colour for all inputs of group 2 green Reset to factory settings The factory settings can be restored by pressing the three buttons HQ LQ LT...

Reviews: