17
-
R
AP029
English
Preliminary operations
Electric disk grinder - 230 V
Protective goggles
Electric welder - min. power: 230 V/100 amp
Protective mask
Electrodes - min. Ø 2
Soldering iron
Suitably powered electric drill - 230 V
Drill bits
Hollow cutter Ø 67 for photocell and control panel mounting holes
Extension lead for welder
Electric cable, cross-section 1.5 mm
2
,various cvarious types
of cable terminals
Electrical scissors
Pliers for cable terminals
Tester
1/20 gauge
Rule
Detergent wipes
Paper hand-towels
2.5 COMPONENTS LAYOUT (B1)
A -
Aprimatic fl ashing warning/courtesy lamp (to be positioned at a
point that is clearly visible from both approaches)
B -
Aprimatic safety photocell
C -
Manual key-operated control unit (magnetic, digital, keyboard
combination lock, mechanical, etc.)
D -
Aprimatic microprocessor control unit in watertight container
(if possible, to be fi tted in a position that is sheltered from
atmospheric agents)
E -
Aprimatic remote control radio receiver (can be fi tted inside
the fl ashing lamp)
F -
Water tight operator electricity supply junction box
(recommended) - to be positioned so that the cables are not
subject to dangerous stretching during the movement of the
gate-leaves
G -
Antenna (optional)
H -
Aprimatic ZT series operators
I -
Electric lock
L -
Open position gate stop
M -
Closed position gate stop
N -
Ground connection for metal framework
Information
Consult the price-list for additional (optional) safety devices.
2.6 ELECTRICAL CONNECTIONS
- When making the electrical connections, carefully follow the
instructions for each of the components, referring to the wiring
diagram (
D1
).
- After making the connections, check the thrust force at the end
of the gate leaf and set to the correct pressure, following the
procedure described in the next paragraph.
- Before making the pressure settings, open and close the gates
electrically a few times to help with the bedding-in, and check that
the motion is uniform throughout the whole movement range.
Warning
!
• The entire circuit must be installed in conformity with the CEI
61-1 and CEI 64-8 regulations.
• Use cable of cross-section 1.5 mm
2
for the wiring.
• If necessary, protect the operator power cable with a sheath;
do this before connecting the cable to the junction box.
Warning
!
•
Operators come with pickup capacitors.
During installation, connect the capacitor/s to the electrical
equipment according to the wiring diagram supplied.
First aid kit
Goniometer
Dynamometer
Plumb line
Spirit level (3-D)
Graphitized grease
Oil -AprimOil HC 13 (specially formulated for Aprimatic)
Zincospray cylinder
Anti-rust paint
Paintbrushes
Thinner for cleaning paintbrushes
Wire brush
Various fi les
Hacksaws
Scribers
Hammer
Chisel for steel and masonry
2.4 BASIC TOOLS AND EXPENDABLE MATERIAL REQUIREMENTS
AP029040
B1
1 Radio
2 Flasher unit
3 Receiving photocell
4 Emitting photocell
5 Internal control panel
6 Key control
7 Electrical lock
8 Electronic control unit
9 Junction box
230 V ± 10%
50 ÷ 60 Hz
AP029041
D1