-
13
-
AT 92 T
English
SLIDING GATES
1000 mm
500
1000 mm
30 mm
INSTALLATION
4.
Realise the foundation for the plate to be cemented.
Warning
!
Other assembly methods where the motor base is not
horizontal are forbidden by the manufacturer.
During the inspection in-situ the installer must ensure
there is space enough all around the gate panel suffi cient
for the overall dimensions.
Preparation for anchoring
4.1
The support base for the operator must be result a few
centimetres above the surrounding ground level.
In very snowy zones or areas subject to flooding we
recommend positioning the plate 10-12 cm above the
ground surface.
Warning
!
It is essential that the foundation works be carried out
perfectly, following the Fig.5-6 instructions, in order
to obtain the correc position of the operator and the
electrical cable with respect to the wing gate.
Excavate a trench (dimensions given in
•
Fig.5
) and fi ll it
with good-quality cement.
Position the anchor tie rods and anchor the plate as
•
described in
Fig.6
.
IMPORTANT! Check the horizontal position of the plate with
a level. - Meet the Fig.7 quotas.
Open
Fig.5
gate
450 mm
155 mm
500 mm
90°
Fig.7
CLOSE
OPEN
DO
NOT
POSITION
THE
OPERATOR
IN
THE
TRANSIT
AREA
The plate must be perfectly level.
Remove any cement splashes.
!
85
500
40
Fig.6
M20 cabinet
fi xing nuts
Ø 60 mm holes for
power supply lines
- provide sheaths
in the anchor plint
Anchor plint
1000x1000x500mm
- unscrew nut and washer
- position the unit cabinet
- reposition washer and nut; then
tighten them completely
anchor
plate