START-UP CHECKLIST
Note: These units should be installed and checked for proper function by qualified service personnel only.
1. Circuit breakers, wire size, all connections tight and correct
2. Condensate drain adequate (size-pitch-trapped)
3. Filter clean and in place
4. Condenser air inlet and outlet free of obstructions and short circuiting
5. Operate unit 20 minutes
6. Controls operation OK
7. Unit installed in compliance with all codes and ordinances
8. All panels in place
9. Work area clean and free of debris
10. Owner or operator instructed on control operation and routine maintenance
11. Name and phone number of service company attached to unit or noted in telephone directory