7
24”
5”
F e n c e
D r i v e w a y
Gate
Inside posts
6”
STEP 2.
Remove chain cover and front lid. Mount to posts using the four supplied 3” U-bolts
STEP 1.
Install two 3” dia. Posts parallel to the gate as shown. Posts height depends on height
preference of operator.
OPERATOR INSTALLATION