12
OPERATING GUIDELINES
E. PRE-HEATER
1. Follow the initial procedures (“A. INITIAL PROCEDURES”).
2. Place PCB to be pre-heated on top of the pre-heater.
3. Activate the Pre-Heater Activation switch (“10” from control panel). This
will automatically start to increase the temperature of the soldering iron
to 100°C (default).
4. Adjust
the
Pre-heating
temperature
using
the
PREHEATING
TEMPERATURE ADJUSTMENT buttons (“5” from the control panel).
5. The top heater may be activated for reworking multilayered boards once
the PCB has been pre-heated to desired temperature.
6. The actual board temperature may be determined by placing the external
sensor on the target board.
7. After reworking deactivate the PREHEATING activation switch.
F. EXTERNAL SENSOR
1. Follow the initial procedures (“A. INITIAL PROCEDURES”).
2. Place PCB to be pre-heated or reworked on top of the pre-heater.
3. Attach the external sensor probe to the external sensor probe receptacle.
(“8” from the control panel).
4. With the soldering iron function switch deactivated press the down button
of the solder iron temperature adjustment button to activate the external
sensor function.
5. The actual board temperature may be determined by placing the external
sensor on the target board.
6. To turn off external sensor probe function press the solder iron up switch.
Summary of Contents for INT866
Page 19: ...19...