10
OPERATING GUIDELINES
IMPORTANT REMINDERS:
1. Make sure the equipment is placed on a flat stable surface
and all the heat-generating components placed on their
respective holders or stands.
2. Ensure all function switches are OFF prior to reworking.
3. Ensure all terminal connections are properly secured.
IMPORTANT:
Please refer to the
CONTROL PANEL GUIDE
page
for buttons and display panel directory.
A. INITIAL PROCEDURES
1. Plug the device to the main power source using the power cord
provided in the package.
2. With all function switches deactivated and all terminal connections
properly secured, switch ON the device by activating the main
power switch (“10” from the control panel).
3. The display panels, will temporarily show the product name
“AOYUE Int 2702” and then display “OFF”. The system will remain
at this state until the user activates a function.
SOLDERING IRON
3
OPERATING GUIDELINES
ASSEMBLY and PREPARATIONS
Summary of Contents for INT 2703A+
Page 30: ...REPLACEMENT SOLDERING TIPS ...