58
C96IB01
EN
Fig. 11 - 3
Removing the pump lock
6.
Use a coin to open the battery cover by turning.
Fig. 11 - 4
Opening the battery cover
7.
Remove the flat batteries by turning the instrument upside down.
8.
Insert the new batteries. The picture on the back of the instrument shows the
correct positioning of the batteries.
9.
Close the battery cover using a coin.
10. Insert the pump lock again and slide it back to the original position. Make sure
you slide the pump lock in the correct direction.
11. Close the pump lock again using the Allen screw.
12. Insert the pump again.
13. Close the pump lock.
The instrument is ready for operation.
14. Check that the instrument is working properly by switching it on and checking
the display.
Summary of Contents for 84138
Page 2: ......
Page 3: ...C96IB01 3 EN DMA 35 Portable Density Meter From Firmware Version V1 79 Instruction Manual ...
Page 72: ...72 C96IB01 EN Appendix C CE Declarations of Conformity ...
Page 73: ...C96IB01 73 EN ...
Page 74: ...74 C96IB01 EN Appendix D EC Type Examination Certificate ...
Page 75: ...C96IB01 75 EN ...
Page 76: ...76 C96IB01 EN Appendix E RFID Module Test Reports ...
Page 77: ...C96IB01 77 EN ...
Page 81: ...C96IB01 81 DE DMA 35 Tragbares Dichtemessgerät Ab Firmwareversion V1 79 Betriebsanleitung ...
Page 153: ...C96IB01 153 DE Anhang C CE Konformitätserklärung ...
Page 154: ...154 C96IB01 DE ...
Page 155: ...C96IB01 155 DE Anhang D EG Baumusterprüfbescheinung ...
Page 156: ...156 C96IB01 DE ...
Page 157: ...C96IB01 157 DE Anhang E RFID Modul Testreports ...
Page 158: ...158 C96IB01 DE ...